10. Remodel
Upstairs Bathroom
Before
Rotten floor joist from old leaky toilet - New subfloor on sistered 2x12” floor joist
At some point, the toilet leaked and rotted the subfloor of this bathroom. This was the main impetus for the remodel. A previous owner cut out the rotten subfloor and added new subfloor on top of it without fixing the rotten joist. To account for the now higher floor height, they replaced the cove tile with a shorter tile that didn’t match the rest.
Broken or mismatched colored tiles were removed and replaced
The bathroom had a lot of moisture problems due in part to not having proper ventilation - I added a vent fan through the roof to fix this.
Basement Bathroom
Before
Drywall removed, insulation added
Mildew resistant drywall added - The original tub and tile were left as is - Added lights in the shower
Since this is a basement bathroom, I added electric heated floor
Reconstituted quarter-sawn walnut floating vanity I designed and built
Still need to get some nice finished photos...
Basement Closet
Basement ‘dungeon’ closet underneath the front porch - I needed a basement utility/bedroom closet - Spray foam insulation prevents moisture buildup on the underside of the corrugated steel decking above.
Before/After
Serves as some much needed bike storage